Appraisals

Personnel who are administered by the SpGp will have their OJAR/SJAR raised by Personnel Military Manager (PMM) BDSUS-SG-Pers-Team-Mailbox@mod.gov.uk  (Sqns and units through their own HR staffs). Personnel should note the following;

Annual Reporting Dates. Subjects are posted into the BDSUS footprint at different times of the calendar year, therefore Subjects and 1st ROs are to establish the correct dates for new reporting periods on the Subject’s arrival. The BDSUS PMM is to act as the central point of contact, and lead, for establishing the correct dates. Personnel should also consult the PMM if their 1st RO is being assigned away from their post/reporting responsibilities.

Mid Period Appraisal Reports (MPARs). MPARs are a shared responsibility between the Subject and the 1st RO. Whilst it is recognised that regular face to face contact for some personnel is difficult within the BDSUS footprint, all efforts should be made by Subject and RO to stay in regular communication. MPARs are not limited to one per year and, in that context, ROs are strongly encouraged to actively manage performance and to provide regular feedback to Subjects either formally or informally, throughout the year. 1 ROs are encouraged to consult both the US and UK CoC when developing MPARs, if applicable. However, the MPAR should at least be completed IAW the dates below, which will then be recorded on JPA during the raising of the NSAR. A copy of the MPAR can be found here.

Non-JPA Access – Non-Standard Appraisal Reports (NSARs). The use of the NSAR format is to be used where access to JPA does not allow reporting through the Subjects JPA workflow. The PMM is responsible for ensuring the NSAR is loaded onto JPA. The PMM will issue the latest NSAR template along with specific MS guidance to each subject as appraisals are raised.

Timely Completion of ARs. 1st ROs should be completed in accordance with the reporting dates table below. Delays  in finalising reports may have a significant impact on an individuals promotion / career aspects. Although the PMM will hasten reports, it is the responsibility of Subjects and RO’s to ensure appraisals are completed in a timely manner. 

Non-JPA Access – Data Capture Sheets (DCS). The PMM will generate a Data Capture Sheet (DCS) for all BDSUS personnel who do not have JPA access to complete annually. It is the Subject responsibility, in conjunction/consultation with their 1st RO to complete the detail on the form and return it to the BDSUS PMM in a timely manner. The responsibilities and objectives are to be completed in consultation with their 1st RO. Once the BDSUS PMM has uploaded the information onto JPA they will return a draft NSAR and Front Page populated with the DCS information. This needs to be checked for accuracy and acknowledged by the Subject so it can be amended if necessary.

Data Capture Sheet (DCS)

Appraisals Reporting Dates

RankAnnual Reporting “To Date”
RN / RM 
Brig/Cdre31-January
Col/Capt30-November
Lt Col/Cdr31-October
Maj/Lt Cdr31-August
Capt/Lt31-May
Lt/2nd Lt/Sub Lt/Midshipman31-March
RN RATINGS 
WO131-July
CPO30-September
PO31-March
LH31-January
AB30-November
RM RATINGS 
WO1/WO230-June
CSgt31-January
Sgt30-June
Cpl31-July
LCpl31-August
MNE31-August
Army
Brig30-November
Col30-November
Lt Col31-October
Maj30-June
Capt31-May
Lt/2nd Lt31-March
WO130-June
WO230-June
SSgt30-September
Sgt30-November
Cpl31-January
LCpl31-March
Pvt31-May
RAF
Air Cdre31-January
Gp Capt30-November
Wg Cdr31-October
Sqn Ldr (Non Aircrew/Ops Spt)31-August
Sqn Ldr (Aircrew & Ops Spt)31-July
Flt Lt (Non Aircrew/Ops Spt)30-June
Flt Lt (Aircrew & Ops Spt Surname A -F)31-March
Flt Lt (Aircrew & Ops Spt Surname G – N)30-April
Flt Lt (Aircrew & Ops Spt Surname O – Z)31-May
Fg Off/Plt Off (Non Aircrew/Ops Spt)31-January
Fg Off/Plt Off (Aircrew & Ops Spt)28-February
WO1-November
FS1-November
Chf Tech1-July
Sgt1-May
Cpl1-September
LCpl (RAF Regiment)1-April
Jnr Tech1-March
SAC(T)1-March
SAC  1-January

Mid-Period Appraisal Review (MPAR)

RN / RM Officers
CdreJuly
Col RM/Capt RNMay
Lt Col RM/ Cdr RNApril
Maj RM/Lt Cdr RNFebruary
Capt RM/Lt RNNovember
Lt RM/2nd Lt/S Lt/MidshipmanSeptember
RN Ratings
WO1January
CPOMarch
POSeptember
LHJuly
ABMay
RM Ratings
WO1/WO2December
CSgt/SgtDecember
CplJanuary
LCplFebruary
MNEFebruary
Army
BrigMay
ColMay
Lt ColApril
MajDecember
CaptNovember
Lt/2nd LtSeptember
WO1December
WO2December
SSgtMarch
SgtMay
CplJuly
LCplSeptember
PvtNovember
RAF
Gp CaptMay
Wg CdrApril
Sqn Ldr (Non Aircrew/Ops Spt)February
Sqn Ldr (Aircrew & Ops Spt)January
Flt Lt (Non Aircrew/Ops Spt)December
Flt Lt (Aircrew & Ops Spt A – F)September
Flt Lt (Aircrew & Ops Spt G – N)October
Flt Lt (Aircrew & Ops Spt O – Z)November
Fg Off/Plt Off (Non Aircrew & Ops Spt)July
Fg Off/Plt Off  (Aircrew & Ops Spt)August
WOMay
FSMay
Chf TechJanuary
SgtNovember
CplMarch
SAC(T)September
SACJuly

 

Last Updated: Sep 29, 2022 @ 11:42 am

Scroll to Top